Examples of construction of special machines

Milling and cutting special machine

Customer need
  • Task automation for the milling and cutting of plastic pipes at a specific length, while following entirely configurable settings defined by the user

Scope of supply
  • Comprehensive mechanical design of the machine

  • Developing the automation and setting management

  • Integrating and programming a robot for milling

  • Designing an automated saw for cutting

Advantages
  • Entirely automated production system

  • Driving ergonomics through the Man-machine interface

  • Production flexibility via settings and reference library

  • Milling and cutting quality

  • Safety: workstation complying with the Machinery Directive

Do you have a project concerning the construction of a special machine?

Dual laminate process special machine

Customer need
  • Film fitting via laminate process

Scope of supply
  • Mechanical design and integration

  • Developing the automation and line interfacing

  • Speed control depending on the line advancing through a sensor to manage the loops in the pits

  • Torque management for the rewinders and unwinders in case of material changes, through a diameter measure via ultrasound sensors

  • Integration into pre-existing production lines

Advantages
  • Speed: up to 30m/min

  • Material stretching management up to 20mm

  • Film lateral position precision lower than 0.5mm

  • Line output: 1 plate every 1.5s

  • Driving ergonomics through the Man-machine interface

  • Safety: workstation complying with the Machinery Directive

Do you have a project concerning the construction of a special machine?

Canula fitting special machine

Customer need
  • A mobile unit that can automatically drop plugs into cases on the customer production line

Scope of supply
  • Mechanical design and integration

  • Developing the automation and line interfacing

  • Integrating a vibrating bowl system to supply plugs

  • Finalizing the vision system (plug orientation detection)

  • Finalizing the robot (SCARA) and the gripping system

  • Preliminary delivery on our premises

  • Final delivery at the customer facility

  • Final delivery and commissioning at the customer facility

Advantages
  • Enhancing the operator workstation

  • Optimising the cycle time (up to 60 lay/minute)

  • Driving ergonomics through the Man-machine interface

  • Safety: workstation complying with the Machinery Directive

Do you have a project concerning the construction of a special machine?